MIGRATION GUIDE / REVIEWED JULY 22, 2026

Intended outcome: A measured rehearsal and a defensible go or no-go decision.

Rehearse the migration before the cutover clock starts

Use representative data to test mapping, transformation, permissions, timing, reconciliation, restoration, and user acceptance.

IMPLEMENTATION SEQUENCE

Work through the change in order

  1. 01

    Freeze the mapping and acceptance rules.

  2. 02

    Prepare an approved representative sample.

  3. 03

    Run the full sequence with timestamps and named owners.

  4. 04

    Compare counts, key fields, relationships, permissions, and reports.

  5. 05

    Restore or roll back and document every defect.

ACCEPTANCE

Save evidence for these checks

  • The elapsed time fits the cutover window.
  • Exceptions have owners and dispositions.
  • Rollback reaches a usable state.
STOP CONDITIONS

Hold the rollout when a boundary breaks

  • Unexplained count difference
  • Permission drift
  • Rollback failure