HANDOFF GUIDE / REVIEWED JULY 22, 2026

Intended outcome: A usable operating handoff and reduced dependency.

Close a technology project without leaving the vendor as the only operator

Require business-owned access, architecture, configuration, procedures, open issues, exports, recovery evidence, training, and review dates.

IMPLEMENTATION SEQUENCE

Work through the change in order

  1. 01

    Verify business ownership of domains, accounts, billing, and administrator access.

  2. 02

    Receive the current system map, decisions, configurations, and data flows.

  3. 03

    Run routine, exception, recovery, and offboarding procedures.

  4. 04

    Transfer source files, exports, credentials through an approved channel, and open issues.

  5. 05

    Schedule access removal and the first post-launch review.

ACCEPTANCE

Save evidence for these checks

  • Two business-controlled administrators can operate.
  • Documentation matches the production state.
  • The business can export data and contact support.
STOP CONDITIONS

Hold the rollout when a boundary breaks

  • Vendor-owned critical account
  • Missing recovery method
  • Undisclosed integration